New request
  1. Request you’re here
  2. Pricing
  3. Contacts
BlaBlaPrice

Start a free chat with service providers and get prices straight from them.

BlaBlaPrice Pros will reply to you, for example like this
Harbour Strip-Out Works

Hello, a basic strip-out of about 400 sq ft in Kowloon is quoted at HK$15–30 per sq ft with waste removal. Is the concrete to be removed as well, and what is the deadline?

Tsuen Wan Demolition Crew

Good day, for a small job in Tsuen Wan we start from HK$2,000, and height work is HK$2,000–5,000 per item. Which district and what exactly needs to come down?

Sha Tin Site Clearance

Hi, we clear sites in Sha Tin and Tuen Mun, with waste removal in each quote. Could you send the site address, scope and deadline?

BlaBlaPrice

See how it works

What needs demolishing?
Add details:
BlaBlaPrice

Demolition in Hong Kong

Basic demolition in Hong Kong is quoted at about HK$15–30 per square foot, with labour and general waste disposal included, and concrete removal adds roughly HK$8–12 per square foot. Small-scale jobs start from around HK$2,000, while full building demolition can reach HK$100,000 or more. The quickest way to current quotes is a request on BlaBlaPrice.

Approximate prices in Hong Kong, November 2026 (sellers' websites)
Type of workPrice range
Basic demolition, labour and general wasteHK$15–30 per sq ft
Concrete removal, added to basicHK$8–12 per sq ft
Height workHK$2,000–5,000 per item
Small-scale demolitionfrom HK$2,000
Full building demolitionHK$100,000 or more

Permits and what the rules say

Demolition of a building or of a substantial part of a building falls under the Building (Demolition Works) Regulations, and the Code of Practice for Demolition of Buildings sets out good practice for planning the work. If the work makes a new discharge into the water of Hong Kong, a licence is required under the Water Pollution Control Ordinance. Ask the contractor which of these apply to your job and who makes the applications.

Concrete, height and access

Quotes usually separate the basic rate from concrete removal and from work at height, which is priced per item in several listings. Say which walls, floors or slabs must come down, because concrete removal and height work are added on top of the basic rate. Tell the seller how the site is reached, since access and carrying out debris affect the crew's time.

Season and timing

Summer in Hong Kong runs from June to August and is the hottest time for crews working outdoors, so plan the heavy stages for cooler weather. Winter, from December to February, is cooler and suits outdoor work better. November is a good time to start, as the work can finish before the hottest months of next summer.

What to put in your request

Say what must be demolished, the structure material (brick, concrete or timber) and the scope of work in square feet. Give the site address and district (Central, Kowloon, Sha Tin, Tsuen Wan or Tuen Mun), the deadline, whether waste removal is included and your budget. A quote is only comparable when every seller knows the same scope.

BlaBlaPrice is free for buyers. You describe the demolition in your own words in a chat and can add photos of the space. Our AI reads the request, asks for any missing details and looks through sellers' websites and price lists in Hong Kong before showing the prices and businesses it found. Sellers registered on BlaBlaPrice reply in the chat with their own offer, price and terms. Your contacts stay hidden until you decide whom to contact. For related work, see construction & renovation, or start with a request on BlaBlaPrice.

Questions and answers

How much does demolition cost per square foot in Hong Kong?

A basic demolition with labour and general waste disposal is quoted at about HK$15–30 per square foot. Concrete removal is an extra HK$8–12 per square foot.

What does a small demolition job cost?

Small-scale jobs start from about HK$2,000, according to sellers' websites. Full building demolitions can reach HK$100,000 or more.

Do I need a permit to demolish?

Demolition of a building or a substantial part falls under the Building (Demolition Works) Regulations. Ask your contractor which approvals apply to your job.

Is a licence needed for water discharge during demolition?

Yes, if the work makes a new discharge into the water of Hong Kong. That needs a licence under the Water Pollution Control Ordinance.

Popular questions

  • Looking for “Demolition”?
    1. Create a free request you’re here
    2. We’ll compare prices in price lists and on websites
    3. Get personal offers
    4. Exchange contacts with the one you choose
  • How does BlaBlaPrice find prices for “Demolition”?
    It compares prices from providers’ price lists, looks through their websites and rates every option against your request: what exactly they’ll do, the price, the timing and the terms. You see what fits you.
  • How do I write a good request?
    Give the main things: the model or what exactly needs doing, condition (new / used), quantity, area and timing. The “Add details” buttons will suggest what to write.
  • How do sellers reply?
    Each seller sends you a personal offer with a price and terms. BlaBlaPrice puts the best value on top, and you choose.
  • Who will see my request?
    Sellers from the right category: BlaBlaPrice picks it. They don’t see your contacts, only the one you choose does.
  • How much does it cost?
    Free for buyers.
chat-bubble