New request
  1. Request you’re here
  2. Pricing
  3. Contacts
BlaBlaPrice

Start a free chat with service providers and get prices straight from them.

BlaBlaPrice

It's free. Nobody calls you: only the one you choose gets your contacts.

  • You compare prices from several firms and decide for yourself whether to agree.
  • No calls: firms write in the chat, and only the one you choose gets your contacts.
  • Free, with no obligation: you can close the request any time.
  • You will get the prices and offers by e-mail and in this request's chat.
BlaBlaPrice

See how it works

What needs building?
Add details:
BlaBlaPrice Candidates will reply to you, for example like this
Gulf Masonry Works

We build black structure in Hawalli and Farwaniya, two floors from KWD 23,950 with basic materials included. How many square metres is the plot, and how many floors do you need?

Jahra Block Crew

We need bricklayers for a finishing job in Jahra, pay agreed per job. How many years of block-wall work have you done, and do you work alone or in a team?

Ahmadi Build Crew

We plan summer work in Ahmadi and Kuwait City around the heat, May to September, so early starts are usual. When do you want to start?

BlaBlaPrice

What a bricklayer costs and how to hire one in Kuwait

We found no published daily rate for bricklayers in Kuwait, so the price is agreed per job. The local figure we found is for building work, not for a bricklayer's pay: a recent local report puts the cost of building one square metre at about KWD 230 (approximately, November 2026). To see current offers for your job, send a request on BlaBlaPrice.

What a bricklayer's price depends on

  • Type of work: block walls, columns and slabs of a new building, or finishing and repairs.
  • Pay: daily, monthly or per job.
  • Place and hours: the site and the working hours agreed.
  • Experience and staffing: years of block-wall work, full time or one project, alone or in a team.
  • Housing: whether the employer provides accommodation.

What do bricklayers charge per day

We found no published daily rate for bricklayers in Kuwait. Ask for the price in writing, per day and for the whole job, and check whether materials are included. A whole-job price shows the total you will pay.

Black structure and materials

How much does it cost to brick a 2000 sq ft house

The black structure is the frame of the building before finishing: the walls, columns and concrete slabs. Sellers publish a two-floor black structure package from KWD 23,950, basic materials included. That is the price of the structure, not a bricklayer's wage. The house size is not stated, so ask for the area in square metres. Compare packages only when they list the same materials.

Permits from the municipality

New construction, an extension or any alteration needs a building permit from Kuwait Municipality before work starts. Permit and site plan fees are small compared with the work. The municipality inspects sites and can remove unlicensed work, so unpermitted building can be stopped or pulled down. Before the first day, ask for a copy of the permit and check that it covers the exact work you are paying for.

Season and when to book

From May to September the heat is very high, so outdoor work is hard in the afternoon. From November to March the weather is mild, the easiest time for work outside. November 2026 is the start of that mild period. If you book for the summer, say in the request whether you accept early starts or evening work.

How to get offers from bricklayers here

Get offers for your job through BlaBlaPrice, which is free for buyers. Describe the work in the chat, with the area, the number of floors, the start date and a photo if you have one. Name the city: Kuwait City, Hawalli, Farwaniya, Ahmadi or Jahra. BlaBlaPrice's AI reads the request, asks for what is missing and looks through sellers' websites and price lists in Kuwait. Sellers who are registered on BlaBlaPrice reply in the chat with their own price and terms. Your contacts stay hidden until you choose whom to contact. For finishing work as a whole, see Construction / finishing works.

Questions and answers

How much does a bricklayer charge per day in Kuwait?

We found no published daily rate, so bricklayers are quoted per job. Ask for the price per day and for the whole job, both in writing.

Do I need a building permit before I build in Kuwait?

Yes. New construction, an extension or an alteration needs a permit from Kuwait Municipality before work starts, and the municipality can remove unlicensed work.

When is the best time to build in Kuwait?

From November to March the weather is mild and outdoor work is easiest. From May to September the heat is very high, so agree early starts.

How do I get bricklayer offers in Kuwait?

Describe the job in the BlaBlaPrice chat, with the area, the floors and the start date. Sellers reply in the chat with their price, and your contacts stay hidden until you choose.

  • Looking for “Bricklayer”?
    1. Create a free request you’re here
    2. We’ll compare prices in price lists and on websites
    3. Get personal offers
    4. Exchange contacts with the one you choose
  • How does BlaBlaPrice find prices for “Bricklayer”?
    It compares prices from providers’ price lists, looks through their websites and rates every option against your request: what exactly they’ll do, the price, the timing and the terms. You see what fits you.
  • How do I write a good request?
    Give the main things: the model or what exactly needs doing, condition (new / used), quantity, area and timing. The “Add details” buttons will suggest what to write.
  • How do sellers reply?
    Each seller sends you a personal offer with a price and terms. BlaBlaPrice puts the best value on top, and you choose.
  • Who will see my request?
    Sellers from the right category: BlaBlaPrice picks it. They don’t see your contacts, only the one you choose does.
  • How much does it cost?
    Free for buyers.
chat-bubble