New request
  1. Request you’re here
  2. Pricing
  3. Contacts
BlaBlaPrice

Start a free chat with service providers and get prices straight from them.

BlaBlaPrice Pros will reply to you, for example like this
Desert Strip Crew

Bathroom strip-outs in Dubai start from about AED 1,500 for a standard room. Is it a bathroom, a kitchen or a full wall, and when do you need it cleared?

Abu Dhabi Demo Partners

Small internal strip-outs in Abu Dhabi start from about AED 5,000, and villa work is priced per square metre. What is the floor area, and does the building need a permit?

Sharjah Clearance

Our crews in Sharjah quote demolition from about AED 40 per sqm. How big is the area, and do you need the debris taken away?

BlaBlaPrice

See how it works

What needs demolishing?
Add details:
BlaBlaPrice

Demolition in the UAE: costs, permit fees and what to check

Demolition in Dubai costs about AED 40 to AED 150 per square metre, a bathroom strip-out about AED 1,500 to AED 3,500, and a whole average house AED 150,000 to AED 500,000. Send the scope and the address in a BlaBlaPrice request to get current offers, because the price depends on what stays standing and how the site is reached.

Approximate prices in United Arab Emirates, October 2026 (sellers' websites)
JobApproximate price
Bathroom strip-out, about 4 to 5 sqmAED 1,500 to AED 3,500
Partial structural demolitionAED 100 to AED 250 per sqm
Full demolitionAED 150 to AED 300 or more per sqm
Average house, DubaiAED 150,000 to AED 500,000

Permit fees differ by emirate

In Dubai a separate demolition permit is listed at AED 1,000 per unit per floor, plus AED 10 Knowledge Dirham and AED 10 Innovation Dirham per transaction. In Ras Al Khaimah the submission fee for a demolition permit is AED 100 and the inspector fee is AED 100, with final fees that depend on the type of building. Small internal strip-outs in Abu Dhabi can start from about AED 5,000. Ask the contractor who files the permit and what it costs.

Waste, dust and building rules

Building rules usually set working hours, lift use, noise and waste, so the contractor must plan debris removal before the first day. Ask whether the quote includes carrying the debris away from the site, and how it leaves the building. Clear rules on noise and lift use protect your neighbours and the building staff, so agree them in writing.

When to schedule it

Demolition is noisy and dusty, and summer from May to September is very hot, so heavy external work is easier in the mild months from November to March, when crews are not working in peak heat. Interior strip-outs can run in summer if the work is indoors and the air conditioning stays on. Agree the working hours before the first day.

What to put in your request

Say what you want demolished, such as a bathroom, a kitchen, a wall or a whole villa, and the structure material, for example block, concrete or steel. Add the floor area, the site address, the access for trucks, your deadline and your budget. Mention whether the contractor should also handle permits and waste removal.

Tell the contractor what to remove, where the site is and when you need it done, in your own words in a BlaBlaPrice chat. Free for buyers. The AI asks for missing details such as area and access, then looks through demolition firms' websites and price lists in the UAE and shows the prices and businesses it finds. Registered sellers reply in the chat with their price and terms, and your contacts stay hidden until you decide who to share them with. See turnkey renovation or construction and renovation, or create a request.

Questions and answers

How much does demolition cost per square metre in Dubai?

Demolition in Dubai is about AED 40 to AED 150 per square metre, and partial structural work about AED 100 to AED 250 per square metre across the UAE, according to sellers' websites in October 2026.

What does a bathroom strip-out cost?

A standard bathroom strip-out of about 4 to 5 square metres typically costs AED 1,500 to AED 3,500.

What permit fees apply in Dubai and Ras Al Khaimah?

In Dubai a demolition permit is listed at AED 1,000 per unit per floor plus AED 10 Knowledge and AED 10 Innovation dirhams. In Ras Al Khaimah the submission and inspector fees are AED 100 each.

When is the best time to demolish?

Heavy external work suits the mild months from November to March, while summer from May to September is very hot.

Popular questions

  • Looking for “Demolition”?
    1. Create a free request you’re here
    2. We’ll compare prices in price lists and on websites
    3. Get personal offers
    4. Exchange contacts with the one you choose
  • How does BlaBlaPrice find prices for “Demolition”?
    It compares prices from providers’ price lists, looks through their websites and rates every option against your request: what exactly they’ll do, the price, the timing and the terms. You see what fits you.
  • How do I write a good request?
    Give the main things: the model or what exactly needs doing, condition (new / used), quantity, area and timing. The “Add details” buttons will suggest what to write.
  • How do sellers reply?
    Each seller sends you a personal offer with a price and terms. BlaBlaPrice puts the best value on top, and you choose.
  • Who will see my request?
    Sellers from the right category: BlaBlaPrice picks it. They don’t see your contacts, only the one you choose does.
  • How much does it cost?
    Free for buyers.
chat-bubble