New request
Business & services > Construction & renovation
Log house construction
Now
  1. Request you’re here
  2. Pricing
  3. Contacts
BlaBlaPrice

Start a free chat with service providers and get prices straight from them.

BlaBlaPrice

You choose who to share contacts with.

BlaBlaPrice Pros will reply to you, for example like this
Falcon Shop

We build with profiled timber and log. Tell me the house area you need and which wall material you like.

Anna J.

We build timber-frame houses with insulation and SIP panels. Tell me the scope: shell only or turnkey.

Nina H.

We raise log houses by hand, and also from a ready kit. Tell me what you already have: design, plot, foundation.

BlaBlaPrice

See how it works

What do you want to build with?
Add details:
BlaBlaPrice

Building a timber house: how to choose the technology and the crew

Choose the technology first

A timber house can be built in several different ways, and the choice decides the price, the timeline and how the house behaves years later. The most common are a log house (from rounded or hewn logs), glued or profiled timber, and timber-frame construction.

Log and timber walls need time to settle: the house “sinks” a little, so finishing and windows are usually fitted later. A frame house is often faster to build, but needs careful vapour barriers and insulation. Discuss this with builders before signing the contract.

How to find a crew through BlaBlaPrice

Instead of hunting for builders on websites and comparing quotes in different formats, you write one request. Crews and companies that build with timber reply in chat: what they offer, at what price or what it depends on, and in what timeframe.

Each crew sees where its offer stands, so they compete on terms. Contacts stay hidden, and only the one you choose receives them. How it all works is on the “How it works” page.

What to put in your request

  • Area and floors — for example, 1,300 sq ft, two floors with an attic room.
  • Wall material — log, glulam, profiled timber, frame.
  • Scope of work — only the shell, up to the roof, or turnkey with finishing.
  • Design — whether you have a ready design or need help with one.
  • Foundation — already poured, or it needs doing too.
  • Type of building — a home, a sauna cabin, a guest house.
  • Location, timing, budget.

Example: “Near Shimla, Himachal Pradesh. I need a two-storey house of glulam, 1,300 sq ft, design ready, foundation already poured. I need the shell up to the roof with insulation, finished before the rainy season. Budget up to A$60,000.”

What changes the cost and how to compare

The same area can be priced very differently by different crews, because they count different things. So compare using a checklist:

  • What timber, and what moisture: kiln-dried or air-dried.
  • Whether antiseptic treatment, fire protection and sealing of joints are included.
  • Whether the quote covers the roof, windows, doors and inner partitions.
  • Who transports the material and whether a crane and scaffolding are included.
  • The payment schedule and the warranty on the work.

Common mistakes

The most frequent mistake is fitting windows and doing the finishing in a log or timber house right away, without waiting for settling. The second is not agreeing in what state the shell is handed over: treated wood or bare wood. The third is starting without a plan for utilities: where water, drainage and electricity will come in. It is best to build them in at the foundation and frame stage, because cutting finished work later is a nuisance.

Do not skimp on wood protection either: without antiseptic and protection from moisture it loses its looks and strength with time. Ask the crew what they treat the wood with and how many coats.

For connecting the systems you will need electrical installation and plumbing, and if you have no design yet, see design and planning. Everything turnkey is in turnkey construction.

Questions and answers

Which is faster to build: a timber or a frame house?

A frame house is usually built faster. A timber or log house needs time to settle, so the final finishing is put off until later.

Do I need a design for a timber house?

Yes, with a design it is easier to work out the estimate and compare offers. If you do not have one, say so in the request and the crews will suggest who can help with the design.

What is better: the contractor’s materials or my own?

Both are possible; the main thing is to state it in the request. Then offers are compared on equal terms.

Will all builders see my number?

No, contacts are hidden. You pass them only to the one you choose, by the channel you choose.

Popular questions

  • Looking for “Log house construction”?
    1. Create a free request you’re here
    2. We’ll compare prices in price lists and on websites
    3. Get personal offers
    4. Exchange contacts with the one you choose
  • How does BlaBlaPrice find prices for “Log house construction”?
    It compares prices from providers’ price lists, looks through their websites and rates every option against your request: what exactly they’ll do, the price, the timing and the terms. You see what fits you.
  • How do I write a good request?
    Give the main things: the model or what exactly needs doing, condition (new / used), quantity, area and timing. The “Add details” buttons will suggest what to write.
  • How do sellers reply?
    Each seller sends you a personal offer with a price and terms. BlaBlaPrice puts the best value on top, and you choose.
  • Who will see my request?
    Sellers from the right category: BlaBlaPrice picks it. They don’t see your contacts, only the one you choose does.
  • How much does it cost?
    Free for buyers.
chat-bubble