New request
  1. Request you’re here
  2. Pricing
  3. Contacts
BlaBlaPrice

Start a free chat with service providers and get prices straight from them.

BlaBlaPrice Pros will reply to you, for example like this
Karoo Build & Finish

Hello, a bathroom refresh in Johannesburg usually starts from R 12,000, and full remodels are quoted per m². What is the floor area and the finish you have in mind?

Highveld Renovations

Good day, for a complete remodel we usually quote from R 7,000 per m², depending on finishes. Could you share the site address, your budget and your deadline?

Cape Coastal Home Works

Hi, an all-inclusive kitchen renovation in Cape Town often falls between R 63,000 and R 190,000. Are you planning new cabinets, and do you need a design project first?

BlaBlaPrice

See how it works

What are we renovating?
Add details:
BlaBlaPrice

Turnkey renovation in South Africa: what it costs

A turnkey renovation in South Africa usually costs about R 7,000 to R 20,000 per m² for a complete remodel, and a full bathroom renovation in Johannesburg can run from R 20,000 to R 250,000. The price depends on the finishes and the size of the project. For a quote for your own house, send a request on BlaBlaPrice and local builders will answer with their offer.

Approximate prices in South Africa, November 2026 (sellers' websites)
JobPrice
Bathroom refresh, JohannesburgR 12,000 – R 60,000
Bathroom, full renovation, JohannesburgR 20,000 – R 250,000
All-inclusive kitchen renovationR 63,000 – R 190,000
Complete home remodel, per m²R 7,000 – R 20,000

Permits and registration

Planning approval is a legal requirement before building, renovation or extension work in South Africa, and the National Building Regulations require approval for structural changes. Some quick home updates do not need council approval, so ask the builder which group your job falls into. If the job includes building work on a home, check that the builder is registered with the NHBRC, because all builders of homes must be registered.

Season and timing

November is late spring, and summer runs from December to February. Many firms slow down over the December holidays, so a job started in November may wait longer for materials and inspections than one planned for February. Winter, June to August, is often quieter for builders, which can make it easier to fix a start date. Set your deadline with these months in mind and allow a buffer for the holiday slowdown.

How renovation is priced here

Builders in Johannesburg, Cape Town, Durban, Pretoria and Gqeberha quote per m² of floor area, per room or as a fixed sum for the whole project. Ask what is included: materials, design work, demolition and waste removal, because a low per-m² figure can leave these out. Use metric units in your request, floor area in m² and wall lengths in metres, so the quotes can be compared directly. Ask also whether the price includes VAT.

What to write in your request

List the site address, the floor area in m², the type of renovation (kitchen, bathroom, whole house or office), the materials you want and whether you need a design project first. Add your deadline and budget. Photos of the current state help builders quote accurately. These details let each builder answer the same job, so you can compare the offers fairly.

On BlaBlaPrice you describe the renovation in your own words in a chat, and a photo of the rooms helps. The AI asks for missing details, then looks through sellers' websites and price lists in South Africa and shows the prices and businesses it found. Builders registered on BlaBlaPrice receive your request and reply in the chat with their price, terms and timing. Your contacts stay hidden until you decide to share them. Start with the request field, or see construction and renovation and turnkey construction.

Questions and answers

How much does a full renovation cost in South Africa?

A complete remodel is usually priced at about R 7,000 to R 20,000 per m², and a full bathroom renovation in Johannesburg can run from R 20,000 to R 250,000.

Do I need planning approval?

Structural and building changes need planning approval under the National Building Regulations, but some quick updates do not need council approval, so ask the builder first.

Is November a good time to start?

A job started in November may run into the December holidays, when many firms slow down, so set the deadline with that in mind.

Should the price include VAT and materials?

Ask whether the quote includes materials, design work, waste removal and VAT, because the same project can be quoted with and without them.

Popular questions

  • Looking for “Turnkey renovation”?
    1. Create a free request you’re here
    2. We’ll compare prices in price lists and on websites
    3. Get personal offers
    4. Exchange contacts with the one you choose
  • How does BlaBlaPrice find prices for “Turnkey renovation”?
    It compares prices from providers’ price lists, looks through their websites and rates every option against your request: what exactly they’ll do, the price, the timing and the terms. You see what fits you.
  • How do I write a good request?
    Give the main things: the model or what exactly needs doing, condition (new / used), quantity, area and timing. The “Add details” buttons will suggest what to write.
  • How do sellers reply?
    Each seller sends you a personal offer with a price and terms. BlaBlaPrice puts the best value on top, and you choose.
  • Who will see my request?
    Sellers from the right category: BlaBlaPrice picks it. They don’t see your contacts, only the one you choose does.
  • How much does it cost?
    Free for buyers.
chat-bubble